Blog & Updates
Pre‑launch preview. Projected launch: 2026.
- Architecture — Modular Microgrid‑Ready Data Halls
- Sustainability — Hourly Carbon Matching vs Annual RECs
- Engineering — Cooling With Northern Climate (Sub‑1.2 PUE)
- Security — Designing a Sovereign Control Plane
- Data Residency — Region‑Locked AI Training Patterns
- Reliability — Remote Multi‑Region DR Patterns
- Network — Backhaul & Latency to Canadian IXPs
- Energy — Battery Systems & Grid Services
- AI Workloads — GPU Density & Thermal Envelope
- Compliance — SOC 2 / ISO 27001 Roadmap
- Open Data — Publishing Environmental Metrics
- Edge — Satellite & Microwave Redundancy
- Economics — Carbon Price Sensitivity for AI Clusters
- Case Study — Sovereign GPU Pods
- Case Study — Financial DR