This is a private Beta preview at /beta. Content may change. Search engines are blocked from indexing. • Updated: 09/04/2025, 15:57 ET

Architecture

Pre‑launch preview. Projected launch: 2026.

How we tie low-visual renewables to modular, liquid-cooled GPU halls with a resilient data fabric.

Power architecture

Generation blend

Tidal and in-stream river provide high predictability; compact wind and BESS fill gaps. Where viable, DC coupling reduces conversion losses.

Distribution

Medium-voltage feeders into hall PDUs with per-pod metering. Liquid loops recover heat at 35–45°C for waste-heat pilots.

Compute & cooling

Pods

8× GPU pods per rack with liquid-cooled manifolds, 60–80 kW per rack. Short air paths; front-to-rear to keep delta-T tight.

Target efficiency

PUE ≈ 1.20 in cold climates via free air and rear-door HX. We monitor hourly energy mix for matching certificates.

Network & data

Fabric

Redundant leaf-spine (Ethernet or IB). Edge gateways per hall; segmentation for tenant isolation and sovereign controls.

Backhaul

Northern fibre loops with satellite or microwave as tertiary failover. Multi-region replication options for storage/DR.