Inuvik, NWT
Pre‑launch preview. Projected launch: 2026.
What we’ll build
2 × 1.5 MW halls (~2600 m²) to start
2 × 1.5 MW halls (~2600 m²) to start
Energy plan
Wind + BESS; in‑stream river pilot
Wind + BESS; in‑stream river pilot
Connectivity
Canada North Fibre Loop; LEO backup
Canada North Fibre Loop; LEO backup
Services
Colo, GPU/HPC, Storage, DR
Colo, GPU/HPC, Storage, DR
Community
Indigenous equity, Youth internships
Indigenous equity, Youth internships
Energy & Carbon (site‑specific)
Annual Energy
— vs —
— less energy
Annual Emissions
— vs —
— lower carbon
Equivalency
— cars’ yearly emissions avoided
4.6 t CO₂e per car/year (EPA estimate).
Methodology: see details.